At Red Valley Construction & Remodeling, we understand that a bathroom remodel is more than just an upgrade – it’s about creating a personal retreat that blends functionality with comfort and style. Let us make your dreams become a reality.
What to Expect During Your Bathroom Remodel
1. Design & Planning Phase
We begin by discussing your goals, style preferences, and budget. Our team will guide you through design selections, including tiles, fixtures, vanities, lighting, and layout adjustments to ensure your new bathroom meets both your needs and aesthetic vision.
2. Demolition
Once the design is finalized and materials are ordered, we will carefully remove existing fixtures, flooring, and walls as necessary. This phase can be noisy and dusty, but we take steps to protect surrounding areas and minimize disruption.
3. Plumbing & Electrical Work
With the space opened up, licensed plumbers and electricians will rough in new plumbing lines, drains, outlets, and lighting wiring. This ensures everything is up to code and properly placed for your new fixtures.
4. Structural or Layout Changes (if applicable)
If your remodel involves moving walls, expanding the bathroom, or altering structural components, this phase will include framing, reinforcing, and preparing the space for its new configuration.
5. Installation
Next comes installation of your bathtub, shower, vanity, toilet, flooring, and wall finishes. Tile work, painting, cabinetry, and trim are completed with attention to detail to achieve a polished result.
6. Final Touches & Inspection
Fixtures, mirrors, accessories, and lighting are installed. We conduct a thorough inspection and final walkthrough with you to ensure everything meets your expectations and functions perfectly.
How Long Will It Take?
A standard bathroom remodel typically takes 2-4 weeks, depending on the scope of work, structural changes, and material availability. We provide a clear timeline and keep you updated throughout each stage.
Preparing for Construction
- Set Up Alternatives: If remodeling your only bathroom, plan for alternative shower and toilet options during construction days.
- Protect Surrounding Areas: We use protective coverings, but it’s helpful to remove fragile items or valuables from nearby rooms.
- Expect Some Noise & Dust: We keep work areas clean and organized daily, but remodeling inevitably involves some dust and noise.
- Communicate Freely: Our team is always available to answer questions and address concerns at any point in your project.